it was also my first time back after my operation soooo...
Their was many things to catch up and hand in this week:
-All the technical drawing from location plan, site plan, 3 floor plans, 2 sections and 4 external elevation was handed in.
-All design theories and precedent studies documents was handed in.
-In Design, space planning was discussed and work on.
-I also stared learning a new computer rendering program called
"3D MAX"
No comments:
Post a Comment